Design and content

UI/UX Design for Websites and Apps

UI is what a screen looks like. UX is whether the person in front of it gets the job done without asking for help. That is the whole of UI/UX design as we do it: every screen of a website, an app or an office system drawn on paper first, drawn for the person who will actually use it, and approved by you before anything is built. The dispatch clerk at a rolling mill, the receptionist at a clinic, the buyer abroad looking for a part number: the screen is laid out for them, not for the owner who signs the bill. The build then goes once, and quoted in writing within one working day.

From the pencil sketch to the screen people open. Three phones showing a form, a grid of icon tiles and a website page, an arrow between them.

Our UI/UX design services for websites and apps

Two ways we draw the screens before the build. Both end with a clickable mock-up you can tap through on your own phone and a handover sheet any developer can build from.

01 / 02

Website UI/UX design

Every page of a new or redesigned website sketched in black and white first, then finished in colour with your real text, so the build starts from an approved plan instead of a guess about what you wanted.

02 / 02

Mobile app UI/UX design

Screens for an Android or iPhone app laid out for one-handed use by the people who will open it every day: your staff on the floor, your dealers on the road, or your customers at home.

Why owners bring the screens to us before the build

Most of the owners who order screen design from us have paid for one rebuild already. These are the reasons they give for not paying for a second.

  • Drawn for the person at the desk. Before the first sketch, we sit with the clerk, the receptionist or the salesman who will use the screen and watch how the job is done today. The screen is laid out around that, not around a presentation to the owner.
  • Approved on paper, built once. A sketch is changed in ten minutes. A built screen is changed in a day and billed. Every argument about what goes where happens at the sketch stage, where it costs nothing.
  • Tested on the phone it will run on. The mock-up is opened on the same make of phone your staff carry, in the yard or the ward, before the build begins. What looks fine on a designer's laptop is not the test.
  • Plain words on every button. Buttons say what happens next, in Gujarati, Hindi or English, in the words your staff already use. Nobody should need a training session to find "Mark as dispatched".
  • One hand, bright sun, dusty screen. Screens for a mill, a yard or a shop floor get bigger targets, higher contrast and fewer steps, because they are used standing up, with gloves, in daylight.
  • Every state drawn, errors too. The empty list, the failed save, the slow connection, the wrong password: each one gets a screen that tells the person what to do, instead of a blank page.
  • The design files are yours. Sketches, final screens and the clickable mock-up are handed over as files you keep, whoever builds the software later.
  • The same team can build it. Or hand the screens to the developer you already pay. Either way, we check the built screens against the drawings before you sign off.

Screens designed around how each trade actually works

A dispatch screen for a steel rolling mill has to take a truck number, a grade, a weight and a buyer in under a minute, keyed by a clerk with a ledger open beside him. A spares listing for a ship-spares yard has to let a purchase manager in another country search by part number and see a photo before he writes. A clinic booking screen has to put today's list first and let the receptionist mark a patient as arrived with one tap while the phone is ringing. A diamond unit's lot tracker has to be read at a sorting table under a lamp. We have built for fourteen of the sixteen sectors on this site, and each of those screens started from an hour spent watching the job, not from a template of somebody else's software.

What decides the cost of a screen design project

Screen design has no rate card here, because a six-screen booking flow for a clinic and a forty-screen dispatch and billing system for a mill are both "design work" and are nothing like each other. What every enquiry gets instead is a written quote within one working day. It lists every screen by name, what each one does, who uses it, how many review rounds are included, what you receive at the end (sketches, final screens, the clickable mock-up, the handover sheet), the dates, the cost and the payment stages. You can send it to your developer, question any line and change the scope before you accept it.

What moves the quote is plain to see: the number of screens, whether they are for a phone only or for a phone and a laptop, how many kinds of people use them (an owner, a clerk and a customer each need different screens), how many languages the text is in, whether there is an existing logo and colour set to follow or one to create, and whether you want us to test the mock-up with your staff before handover. Each of those is a separate line in the quote, so a smaller budget means removing a line, not getting a thinner version of the whole.

  • Every screen named, with its user and its purpose, on one sheet.
  • Within one working day of the first conversation.
  • Holds for 30 days, with no commitment on your side.
  • Sketch stage and final stage priced separately, so you can stop after the sketches if you wish.
  • Usable by any developer, ours or the one you already have; the handover sheet is part of the quote.
  • Changes to the scope before you sign cost nothing.

From first call to approved screens in five steps

The same five steps for a two-screen form and a whole office system. You see every screen as a sketch before you see it in colour, and nothing is built until you have said yes to both.

Five stacked cards for call, written quote, sketches, final screens and the handover to the build
  1. Call

    Twenty minutes on who will use the screens, how the job is done today (a register, a spreadsheet, a WhatsApp group), what must become faster and what must stop going wrong. On the phone, on WhatsApp video or at your premises.

  2. Written quote

    Within one working day: every screen named, who uses it, review rounds, what you receive, dates, cost and payment stages. This is the moment most owners add a screen they forgot or remove one nobody needs.

  3. Sketches

    Each screen drawn in black and white, with real field names and real buttons but no colour, so the discussion is about what goes where. We walk through them with the person who will use the screens and change them on the spot.

  4. Final screens

    The approved sketches finished in your colours with your logo and real text in the language your staff read, then joined into a clickable mock-up you open on your own phone and tap through like the finished thing.

  5. Handover and build

    A handover sheet with sizes, colours, spacing and every state of every screen goes to the developer, ours or yours. When the screens are built, we compare them to the drawings and list anything that drifted.

What the design needs from your side

An hour or two of the right person's time, and a few photos. Nothing on this list needs a computer.

  • The person who will use the screens, for one hour at the sketch stage and one at the final stage.
  • How the job is done today: the register page, the spreadsheet, the WhatsApp messages, photographed as they are.
  • Your logo and brand colours, or a visiting card we can take them from.
  • Real sample data: ten actual products, a week of real dispatches, the fields on your current patient slip. Names can be blanked.
  • The phones your staff carry, make and screen size, so the mock-up is tested on the same ones.
  • One final yes, from one person, after the users have been heard.

Six screen design mistakes that end in a rebuild

Every redesign we are asked for begins with one of these. If one of them is yours, the fix is a set of sketches, not a new project.

The clerk was never asked

The screens were shown to the owner in a meeting and approved there. The clerk who uses them two hundred times a day was never asked. We start the sketches at the clerk's desk.

Built first, drawn never

The developer began coding on the first day, and every change since has been a paid change. We draw the remaining screens before another line is written, so the rest of the build goes once.

Forty fields on one screen

Every column of the old register was carried onto one page, so nothing is found without scrolling. We split it into the three or four questions the person actually answers, in the order they answer them.

Buttons that only say "Submit"

Nobody knows whether pressing it saves, sends or deletes. We rename every button to say what happens next, in the language the user reads.

Fine on a laptop, not the yard

Small targets, grey-on-white text, four taps to do one thing. In sunlight, with gloves, it fails. We redraw those screens for one hand and bright light.

The error nobody drew

A failed save shows a blank page, so the clerk types the whole entry again. We draw the error, the empty list and the slow-network state, each with a plain message and a way back.

UI/UX questions owners ask before they order

What do UI and UX actually mean, in plain words?

UI is the look of a screen: the layout, the colours, the buttons. UX is whether a person can get the job done on that screen quickly and without asking anyone. A screen can be good-looking and still fail the receptionist who uses it all day. We design for both, but when the two pull against each other, the person using it wins.

Do we need screen design if we are already paying someone to build the software?

If the builder is drawing the screens before writing code and showing them to the people who will use them, no. If the first time you see a screen is when it is built, yes, because every change after that point is paid for twice. A set of approved sketches given to the builder usually saves more than it costs in changes avoided.

Can you design the screens and let our own developer build them?

Yes, and it is common. You receive the final screens, the clickable mock-up and a handover sheet with sizes, colours, spacing and every state, which any developer can build from. If you wish, we check the built screens against the drawings at the end and send your developer a list of what drifted.

How many screens does a typical project have?

A booking flow for a clinic or a salon is usually six to ten screens. A product listing with a dealer login runs to twenty. A dispatch, stock and billing system for a mill can pass forty once every state is drawn. The written quote names each screen, so you see the count before you commit, and you can take screens out.

How long does the design stage take?

Sketches for a small project are ready within a week of the quote being accepted, with the final screens a week or two after your approval. A full office system takes four to six weeks, most of it spent waiting for your staff to review each round. The quote gives dates for each stage.

Will the screens work in Gujarati and Hindi as well as English?

Yes. The text on buttons and labels is written in the language your staff read, not translated by a machine at the end, because Gujarati labels run longer than English ones and a screen drawn only in English breaks when they are swapped in. Multi-language screens are drawn in the longest language first.

Can you redesign the screens of software we already use?

Often, yes. If the software was built for you and you have the developer or the login, we draw new screens over the same data and they build them. If it is a bought product that cannot be changed, we tell you so on the first call, and may suggest a small app or form in front of it for the staff who struggle with it.

Do you test the screens with our staff before handover?

Yes, when you include that line in the quote. We sit with two or three of the people who will use the screens, give them real tasks on the clickable mock-up, and note where they hesitate or tap the wrong thing. Those places are fixed in the drawings before the build, where a fix takes minutes rather than days.

What do we receive at the end of the design stage?

The sketches of every screen, the final screens in colour, a clickable mock-up you can open on any phone, and a handover sheet for the developer with sizes, colours, spacing and every state. All of it as files you keep. If we also build the software, the same files are the plan the build is checked against.

Can the same screens be used for both the website and the app?

The same look, the same words and the same colours, yes. The layouts are drawn separately, because a laptop screen and a phone screen are used differently: a clerk at a desk wants more on one page, a salesman on the road wants one task per screen. Drawing both from one set of rules keeps them feeling like one product.

Next step

Ready for screens your staff will actually use?

Call, WhatsApp or e-mail us. You will have a written quote within one working day.